The Western Sydney University Campbelltown Laboratory project required the total demolition and strip out of the existing PC2 Laboratory. PCI was engaged to turn this existing space into an upgraded PC1 Laboratory.
The upgrades included a new Laboratory preparation room, cool room and fridge room. Services such as reticulating chilled water, laboratory gasses, power & data were saw cut and trenched into the existing slab. The areas received an entire mechanical upgrade in accordance with PC1 laboratory standards. 5 new Dynaflow fume cupboards were installed, along with all new chemical resistant benching and cabinetry.